International Lake Ontario – St. Lawrence River Study Board
Meeting in Ottawa
October 19 and 20, 2004
SUMMARY OF MEETING
Board members in attendance were: Eugene Stakhiv, Doug Cuthbert, Tony Eberhardt, Ed Eryuzlu, Frank Sciremammano, Frank Quinn, Andre Carpentier,
Pete Loucks, Sandy LeBarron, Marcel Lussier, Dan Barletta, Jim Snyder, Lynn Cleary, Steven Renzetti, Ian Crawford. Others in attendance for all or part of the meeting were: Elaine Kennedy, Max Streibel, Scott Tripoli, Bill Werick, Wendy Leger, Roger Gauthier, Connie Hamilton, Jeff Watson, David Fay, Mark Lorie, Debbie Lee, Tom McAuley, Russ Trowbridge, Greg McGillis, Arleen Kreusch, Mike Shantz, Scott Tripoli, Henry Stewart, Paul Webb, John Hall, Larry Field, Jean-Francois Bibeault, Annie Carriere, Denis Peloquin, Cindy Lavean, Christiane Hudon, Joe Atkinson, Paul King-Fisher, Joe DePinto, Todd Redder, Mark Colosimo, Frank Lupi, Sylvain Robert and John Ching.
Review of agenda, burning issues, IJC Appearance
The Board meeting was scheduled to coincide with the Plan Formulation and
Evaluation (PFEG) workshop (Notes for the workshop are provided separately by
Wendy Leger and Bill Werick). The agenda (attached) was approved.
- The Board discussed and approved hiring of a consultant to review the
costing methodology for hydropower. Paul King-Fisher will explore options
and propose the sole-source consultant; he obtain the support/endorsement
of the Hydro-Power TWG; cost will be limited to $20-30K Cdn; work to be
performed and complete in the Nov./ Dec. 2004 timeframe; funds to be
covered from the current PFEG budget.
- Doug summarized the main highlights of the presentation to the IJC semi-annual appearance.
- It is agreed that the PIAG contributions need to be recognized; this will be
brought to the attention of the Commission. Recognition was also mentioned
for those that assisted with arranging the public meetings; notably Greg
McGillis and Arleen Kreusch and their staffs.
- Board agreed that January 2005 would be appropriate time to thank the TWG
participants recognizing some members will depart by then.
Actions Deriving from the PIAG 2004 Summer Public Meetings:
- Board decided to hold conference-calls about every other two weeks to get
updated on the Shared Vision Model and plan options being developed; the calls will be at 3:00 p.m. on the following days: Nov 4; Nov 18; Dec 2; Dec 16;
Dec 30 and Jan 13.
- The Board identified the following members as Guideline Captains:
- Environmental Sustainability: Sandra LeBarron
- Net Economic Benefits: Steven Renzetti
- Disproportionate Loss: Ian Crawford
- Unusual / Unexpected Conditions: Frank Sciremammano
- Mitigation: Gene Stakhiv
- Climate Change and Variability: Frank Quinn
- Transparent Decision Making: Marcel Lussier and Dan Barletta
- Adaptive Management: Lynn Cleary
- Institutional Arrangements: Doug Cuthbert
- The next face-to-face meeting will be held in Rochester NY; it was decided to
hold ½ -day Board meeting on January 25, 2005 (in the p.m.) to be followed
by a 2-day workshop on January 26 and 27, 2005. Invited to the workshop
are all Board members, the PIAG and the TWG's.
- A meeting will be held with the Control Board just before the next March
Study Board meeting; the Control Board will be briefed on the SVM and on the
plan development options.
- The next Board meeting will be 3-days on March 22, 23 and 24, 2005
attended by PIAG the last one-and-a-half days.
- For the next summer public meetings, the following format was decided on:
- PIAG will plan and present the events;
- PFEG will make the SVM presentation
- There will be US / Canadian Board members presence on both sides
of the border at all meetings.
- PIAG will work with PFEG to arrange a meeting on December 2, 2004 with representatives of
certain interests (mini-interest groups) on the south shore of Lake Ontario.
Status of Year-4 budget and setting of Year-5 budget
- The U.S. Year 4 budget year ended on September 30, 2004 with an
uncommitted balance of $896 (essentially 100%). At the mid-point of the
Canadian Year 4 budget, $2,252,257 has been committed (93%). In both
cases, the shortfall that had existed is or was expected to be eliminated.
- Proposed Year 5 budgets were presented (see the revised tables - PDF format).
Notional amounts for TWG activities were approved as a whole rather
than as individual items. The PIAG budget was capped at $320K U.S.
and $415K Cdn. The IM budget had been approved previously.
|